LATEST Jan. 27, 12:30 p.m. After 13 hours of roadwork, Caltrans announced that both directions of Interstate 5 are open through Tejon Pass and the Grapevine. Jan. 27, 9:48 a.m. For the second time in a week,
CHP will be escorting traffic for both southbound and northbound lanes through the Grapevine.CHP ask travelers to be patient as CHP and Ca
Lincoln Smith was indicted on 12 counts including seven counts of manslaughter and driving under the influence of intoxicants following the crash in May 2023.
The closures are part of WSDOT’s Revive I-5 work to replace concrete panels and expansion joints, resurface bridge decks, improve Ship Canal Bridge drainage and repair structural components on the bridge. Since 2019, the bridge has required more than 200 emergency repairs, and it was last resurfaced in 1985, according to WSDOT.
The state says the closure will last at least through the evening commute, and encourages motorists to seek other routes.
On Monday, bridge maintenance crews closed the Interstate 90 (I-90) west ramp in Seattle to Interstate 5 (I-5) north for “urgent expansion joint repairs,” according to WSDOT. WSDOT reported, at 4:20 p.m., the traffic backup is currently more than 4 miles.
The closure was in place beginning around 10:40 p.m. Sunday for southbound and northbound lanes of I-5 between Grapevine Road and Parker Road in Castaic. Officers were escorting and pacing traffic and snowplows were clearing the roadway on Sunday before the full closure.
A key stretch of Interstate 5 closed after a snowstorm swept through Southern California, Caltrans said. The California Department of Transportation closed the freeway around 12:15 a.m. Monday after snow and ice made the Grapevine impassable. “ I-5 will remain closed until the snow stops and the roadway is snow and ice-free,” Caltrans posted on X.
Snow briefly shut down a key interstate north of Los Angeles for hours while weekend downpours doused wildfires across Southern California
The Washington State Department of Transportation has announced a traffic alert that will impact the heart of Seattle.
Interstate 5 is reopened after it was closed for a fatal crash investigation Friday morning. The crash happened after 1 am on I-5 between Bridgeport and SR 512 near Lakewood. The Washington State Patrol (WSP) says a driver going the wrong way struck another car head-on.
A major construction project that would have shrunk part of Interstate 5 in Seattle for months, clogging traffic, has been delayed. A spokesperson with the Washington State Department of Transportation (WSDOT) confirmed Monday that the construction is expected to begin in 2026.